Electric 2013
Orders and Notices
These orders and notices are stored in PDF format. They are listed by the month issued, docket number, name of the order, notice, or (occasionally) another type of document issued by the Public Service Commission of Utah.
January | |
---|---|
1/22/2013 | Docket No. 12-035-67 — Order Granting Intervention (PDF) (Issued: 1/22/13) Rocky Mountain Power – Application to Increase Rates by $29.3 Million or 1.7 Percent Through the Energy Balancing Account |
1/23/2013 | Docket No. 12-035-67 — Order Amending Hearing Schedule (PDF) (Issued: 1/23/13) Rocky Mountain Power – Application to Increase Rates by $29.3 Million or 1.7 Percent Through the Energy Balancing Account |
1/31/2013 | Docket No. 12-035-67 — Order on Stipulated Motion to Sever Special Contract Issues (PDF) (Issued: 1/31/13) Rocky Mountain Power – Application to Increase Rates by $29.3 Million or 1.7 Percent Through the Energy Balancing Account |
1/8/2013 | Docket No. 12-035-92 — Order Amending Procedural Schedule and Notice of Scheduling Conference (PDF) (Issued: 1/8/13) Rocky Mountain Power – Request for Approval of Resource Decision to Construct Selective Catalytic Reduction Systems on Jim Bridger Units 3 and 4 |
1/17/2013 | Docket No. 12-035-92 — Notice of Amended Hearing Date (PDF) (Issued: 1/17/13) Rocky Mountain Power – Request for Approval of Resource Decision to Construct Selective Catalytic Reduction Systems on Jim Bridger Units 3 and 4 |
1/29/2013 | Docket No. 12-035-92 — Notice of Pre-Hearing Conference (PDF) (Issued: 1/29/13) Rocky Mountain Power – Request for Approval of Resource Decision to Construct Selective Catalytic Reduction Systems on Jim Bridger Units 3 and 4 |
1/3/2013 | Docket No. 12-035-100 — Order Granting Intervention (PDF) (Issued: 1/3/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
1/7/2013 | Docket No. 12-035-100 — Order Granting Intervention (PDF) (Issued: 1/7/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
1/9/2013 | Docket No. 12-035-114 — Order Approving Pole Attachment Agreement, Subject to Filing of Revised Electric Service Schedule No. 4 (PDF) (Issued: 1/9/13) Rocky Mountain Power and Zayo Group, LLC – Application for Approval of the Pole Attachment Agreement |
1/15/2013 | Docket No. 12-035-116 — Order (PDF) (Issued: 1/15/13) Rocky Mountain Power – DSM Annual Report Filing |
1/16/2013 | Docket No. 12-035-116 — Erratum Order (PDF) (Issued: 1/16/13) Rocky Mountain Power – DSM Annual Report Filing |
1/15/2013 | Docket No. 12-035-117 — Order (PDF) (Issued: 1/15/13) Rocky Mountain Power – Annual Report Cost-Effectiveness Testing Requirements |
1/16/2013 | Docket No. 12-035-117 — Erratum Order (PDF) (Issued: 1/16/13) Rocky Mountain Power – Annual Report Cost-Effectiveness Testing Requirements |
1/29/2013 | Docket No. 12-035-119 — Order Approving Customer Service Agreement (PDF) (Issued: 1/29/13) Rocky Mountain Power – Application for Approval of its Customer Service Agreement with the City of Enterprise, Utah |
1/28/2013 | Docket No. 13-035-02 — Notice of Scheduling Conference (PDF) (Issued: 1/28/13) Rocky Mountain Power – Application for Authority to Change its Depreciation Rates Effective January 1, 2014 |
February | |
---|---|
2/21/2013 | Docket Nos. 11-035-73 and 11-2035-01 — Report and Order (PDF) (Issued: 2/21/13) PacifiCorp – Application for Approval of a Solicitation Process for an All-Source Resource for the 2016 Time Period and 2011 Integrated Resource Plan |
2/27/2013 | Docket No. 12-035-67 — Report and Order (PDF) (Issued: 2/27/13) Rocky Mountain Power – Application to Increase Rates by $29.3 Million or 1.7 Percent Through the Energy Balancing Account |
2/7/2013 | Docket No. 12-035-100 — Amended Notice of Hearing (PDF) (Issued: 2/7/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
2/12/2013 | Docket No. 12-035-100 — Order Granting Intervention (PDF) (Issued: 2/12/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
2/6/2013 | Docket No. 13-028-01 — Order (PDF) (Issued: 2/6/13) Garkane Energy Cooperative, Inc. – Construction of a 30 Mile 138 kV Transmission Line from Tropic, Utah to Hatch, Utah |
2/11/2013 | Docket No. 13-035-01 — Order Granting Extension of Time (PDF) (Issued: 2/11/13) Rocky Mountain Power – Proposed Utah Service Reliability Performance Baselines |
2/8/2013 | Docket No. 13-035-02 — Notice of Scheduling Order, Technical Conference, and Hearing (PDF) (Issued: 2/8/13) Rocky Mountain Power – Application for Authority to Change its Depreciation Rates Effective January 1, 2014 |
2/28/2013 | Docket No. 13-035-13 — Order (PDF) (Issued: 2/28/13) Rocky Mountain Power – Application for Approval of a Promotional Program Pursuant to R746-404 |
2/12/2013 | Docket No. 13-2035-01 — Order Granting Extension of Time (PDF) (Issued: 2/12/13) PacifiCorp – 2013 Integrated Resource Plan (IRP) |
2/27/2013 | Docket No. 13-035-T01 — Order (PDF) (Issued: 2/27/13) Rocky Mountain Power – Schedule 194 Demand Side Management Cost Adjustment Credit |
March | |
---|---|
3/21/2013 | Docket Nos. 03-035-14 and 12-035-101 — Order on Tariff Modifications (PDF) (Issued:3/21/13) Rocky Mountain Power – Application for Approval of Changes to Tariff Schedule No. 38, Qualifying Facility Procedures |
3/1/2013 | Docket No. 10-035-57 — Order (PDF) (Issued: 3/1/13) Rocky Mountain Power – Demand-Side Management 2010 Semi-Annual Forecast |
3/1/2013 | Docket No. 12-035-97 — Notice of Hearing on Settlement Stipulation (PDF) (Issued: 3/1/13) Rocky Mountain Power – Applications for a Certificate of Public Convenience and Necessity Authorizing Construction of the Sigurd – Red Butte No. 2 345 kV Transmission Line |
3/15/2013 | Docket No. 12-035-97 — Report and Order (PDF) (Issued: 3/15/13) Rocky Mountain Power – Applications for a Certificate of Public Convenience and Necessity Authorizing Construction of the Sigurd – Red Butte No. 2 345 kV Transmission Line |
3/19/2013 | Docket No. 12-035-97 — Cover Letter Report and Order (Re-Issued) (PDF) (Issued: 3/19/13) Rocky Mountain Power – Applications for a Certificate of Public Convenience and Necessity Authorizing Construction of the Sigurd – Red Butte No. 2 345 kV Transmission Line |
3/6/2013 | Docket No. 12-035-100 — Order Granting Intervention (PDF) (Issued: 3/6/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
3/27/2013 | Docket No. 12-035-100— Order Granting Intervention (PDF) (Issued: 3/27/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
3/6/2013 | Docket No. 12-035-102 — Amended Notice of Hearing (PDF) (Issued: 3/6/13) Rocky Mountain Power – Voluntary Request for Approval of Resource Decision to Acquire Natural Gas Resource |
3/12/2013 | Docket No. 12-035-102 — Order Granting Intervention (PDF) (Issued: 3/12/13) Rocky Mountain Power – Voluntary Request for Approval of Resource Decision to Acquire Natural Gas Resource |
3/21/2013 | Docket No. 12-035-102 — Order Vacating Scheduling Order and Notice of Hearing (PDF) (Issued: 3/21/13)Â Rocky Mountain Power – Voluntary Request for Approval of Resource Decision to Acquire Natural Gas Resource |
3/5/2013 | Docket No. 13-035-02 — Order Granting Intervention (PDF) (Issued: 3/5/13) Rocky Mountain Power – Application for Authority to Change its Depreciation Rates Effective January 1, 2014 |
3/15/2013 | Docket No. 13-035-20 — Order (PDF) (Issued: 3/15/13) Rocky Mountain Power – Application for Authority to Cancel Electric Service Schedule No. 96A Irrigation Load Control Tariff; Approve a New Demand Side Management Contract and Approve a Schedule No. 105 Irrigation Demand Response |
3/28/2013 | Docket Nos. 13-035-32 and 13-035-33 — Notice of Scheduling Conferences (PDF) (Issued: 3/28/13) Rocky Mountain Power – Applications |
3/21/2013 | Docket No. 13-035-T03 — Order (PDF) (Issued: 3/21/13) Rocky Mountain Power – Proposed Changes to Regulation No. 7 “Metering” and Schedule No. 300 “Regulation Charges” to Allow for Non-Standard Meters |
April | |
---|---|
4/5/2013 | Docket No. 12-035-100 — Order on Pro Hac Vice Admission (PDF) (Issued: 4/5/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
4/11/2013 | Docket No. 12-035-100 — Order Granting Intervention (PDF) (Issued: 4/11/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
4/18/2013 | Docket No. 12-035-100 — Order Granting Intervention (PDF) (Issued: 4/18/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
4/19/2013 | Docket No. 12-035-102 — Report and Order (PDF) (Issued: 4/19/13) Rocky Mountain Power – Voluntary Request for Approval of Resource Decision to Acquire Natural Gas Resource |
4/4/2013 | Docket No. 13-035-01 — Notice of Technical Conference (PDF) (Issued: 4/4/13) Rocky Mountain Power – Proposed Utah Service Reliability Performance Baselines |
4/12/2013 | Docket No. 13-035-22 — Notice of Rescheduled Hearing (PDF) (Issued: 4/12/13) Energy of Utah vs. Rocky Mountain Power – Formal Complaint |
4/12/2013 | Docket No. 13-035-22 — Notice of Hearing (PDF) (Issued: 4/12/13) Energy of Utah vs. Rocky Mountain Power – Formal Complaint |
4/30/2013 | Docket No. 13-035-22 — Order Dismissing Complaint and Cancelling Hearing (PDF) (Issued: 4/30/13) Energy of Utah vs. Rocky Mountain Power – Formal Complaint |
4/8/2013 | Docket No. 13-035-32 — Scheduling Order and Notice of Hearing (PDF) (Issued: 4/8/13) Rocky Mountain Power – Application to Increase the Deferred EBA Rates through the Energy Balancing Account Mechanism |
4/12/2013 | Docket No. 13-035-32 — Amended Scheduling Order and Notice of Hearing (PDF) (Issued: 4/12/13) Rocky Mountain Power – Application to Increase the Deferred EBA Rates through the Energy Balancing Account Mechanism |
4/29/2013 | Docket No. 13-035-32 — Order Granting Intervention (PDF) (Issued: 4/29/13) Rocky Mountain Power – Application to Increase the Deferred EBA Rates through the Energy Balancing Account Mechanism |
4/8/2013 | Docket No. 13-035-33 — Scheduling Order and Notice of Interim Rates Hearing (PDF) (Issued: 4/8/13) Rocky Mountain Power – Application for Authority to Revise Rates in Tariff Schedule 98, Renewable Energy Credits Balancing Account |
May | |
---|---|
5/10/2013 | Docket No. 12-035-92 — Redacted Report and Order (PDF) (Issued: 5/10/13) Rocky Mountain Power – Voluntary Request for Approval of Resource Decision to Construct Selective Catalytic Reduction Systems on Jim Bridger Units 3 and 4 |
5/30/2013 | Docket No. 12-035-92 — Redacted Order of Clarification (PDF) (Issued: 5/30/13) Rocky Mountain Power – Voluntary Request for Approval of Resource Decision to Construct Selective Catalytic Reduction Systems on Jim Bridger Units 3 and 4 |
5/10/2013 | Docket No. 12-035-100 — Order (PDF) (Issued: 5/10/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
5/30/2013 | Docket No. 13-035-01 — Order on Performance Baselines (PDF) (Issued: 5/30/13) Rocky Mountain Power – Proposed Utah Service Reliability Performance Baselines |
5/22/2013 | Docket No. 13-035-19 — Notice of Filing and Comment Period (PDF) (Issued: 5/22/13) Rocky Mountain Power – Application for Approval of its Customer Service Agreement with Spring City, Utah |
5/20/2013 | Docket No. 13-035-32 — Order Granting Intervention (PDF) (Issued: 5/20/13) Rocky Mountain Power – Application to Increase the Deferred EBA Rates through the Energy Balancing Account Mechanism |
5/21/2013 | Docket No. 13-035-33 — Order Granting Intervention (PDF) (Issued: 5/21/13) Rocky Mountain Power – Application for Authority to Revise Rates in Tariff Schedule 98, Renewable Energy Credits Balancing Account |
5/29/2013 | Docket No. 13-035-33 — Report and Order (PDF) (Issued: 5/29/13) Rocky Mountain Power – Application for Authority to Revise Rates in Tariff Schedule 98, Renewable Energy Credits Balancing Account |
5/16/2013 | Docket No. 13-035-63 — Order Granting Extension of Time (PDF) (Issued: 5/16/13) Rocky Mountain Power – 2013 Avoided Cost Input Changes Quarterly Compliance Filing |
5/7/2013 | Docket No. 13-035-69 — Notice of Filing and Comment Period (PDF) (Issued: 5/7/13) Rocky Mountain Power – Fossil Fuel Heat Rate Improvement Plan for 2013 |
5/16/2013 | Docket No. 13-035-70 — Notice of Filing and Comment Period (PDF) (Issued: 5/16/13) Rocky Mountain Power – Service Quality Review Report |
5/17/2013 | Docket No. 13-035-71 — Notice of Filing and Comment Period (PDF) (Issued: 5/17/13) Rocky Mountain Power – Demand-Side Management 2012 Annual Energy Efficiency and Peak Load Reduction Report |
5/22/2013 | Docket No. 13-035-78 — Notice of Filing and Comment Period (PDF) (Issued: 5/22/13) Rocky Mountain Power – Application for Approval of its Customer Service Agreement with Spring City, Utah |
5/22/2013 | Docket No. 13-035-89 — Notice of Filing and Comment Period (PDF) (Issued: 5/22/13) Rocky Mountain Power – Application for Authority to Cancel Electric Service Schedules No. 115, 125, 126, and 192; Approve Schedule No. 140 |
5/17/2013 | Docket No. 13-2035-01 — Notice of Filing and Scheduling Conference (PDF) (Issued: 5/17/13) PacifiCorp – 2013 Integrated Resource Plan (IRP) |
5/3/2013 | Docket No. 13-035-T08 — Order Suspending Proposed Changes to Electric Service Regulation No. 3 (PDF) (Issued: 5/3/13) Rocky Mountain Power – Proposed Changes to Electric Service Regulation No. 3 |
5/7/2013 | Docket No. 13-035-T08 — Notice of Scheduling Conference (PDF) (Issued: 5/7/13) Rocky Mountain Power – Proposed Changes to Electric Service Regulation No. 3 |
5/21/2013 | Docket No. 13-035-T08 — Scheduling Order, Notice of Technical Conference, and Notice of Hearing (PDF) (Issued: 5/21/13) Rocky Mountain Power – Proposed Changes to Electric Service Regulation No. 3 |
June | |
---|---|
6/26/2013 | Docket No. 12-035-92 — Order Denying Request for Review or Rehearing (PDF) (Issued: 6/26/13) Rocky Mountain Power – Voluntary Request for Approval of Resource Decision to Construct Selective Catalytic Reduction Systems on Jim Bridger Units 3 and 4 |
6/4/2013 | Docket No. 12-035-100 — Notice of Public Witness Day Hearing (PDF) (Issued: 6/4/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/4/2013 | Docket No. 12-035-100 — Order on Pro Hac Vice Admission (PDF) (Issued: 6/4/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
6/10/2013 | Docket No. 12-035-101 — Order on Tariff Modifications (PDF) (Issued: 6/10/13) Rocky Mountain Power – Application for Approval of Changes to Tariff Schedule No. 38, Qualifying Facility Procedures |
6/24/2013 | Docket No. 13-035-32 — Order Shortening Response Time (PDF) (Issued: 6/24/13) Rocky Mountain Power – Application to Increase the Deferred EBA Rates through the Energy Balancing Account Mechanism |
6/24/2013 | Docket No. 13-035-32 — Erratum Order Shortening Response Time (PDF) (Issued: 6/24/13) Rocky Mountain Power – Application to Increase the Deferred EBA Rates through the Energy Balancing Account Mechanism |
6/12/2013 | Docket No. 13-035-58 — Order Approving Asset Transfer Agreement (PDF) (Issued: 6/12/13) Rocky Mountain Power – Application for Approval of its Asset Transfer Agreement with the City of Blanding, Utah |
6/14/2013 | Docket No. 13-035-72 — Order Granting Extension of Time (PDF) (Issued: 6/14/13) PacifiCorp – Financial Reports |
6/28/2013 | Docket No. 13-035-89 — Order (PDF) (Issued: 6/28/13) Rocky Mountain Power – Application for Authority to Cancel Electric Service Schedules No. 115, 125, 126, and 192; Approve Schedule No. 140 |
6/3/2013 | Docket No. 13-2035-01 — Scheduling Order and Notice of Technical Conference (PDF) (Issued: 6/3/13) PacifiCorp – 2013 Integrated Resource Plan |
6/12/2013 | Docket No. 13-035-T09 — Notice of Filing and Comment Period (PDF) (Issued: 6/12/13) Rocky Mountain Power – Directed to Calculate and File Schedule 37 Avoided Costs Annually to Establish the Value or Credit for Net Excess Generation of Large Commercial Customers Under the Schedule 135 Net Metering Service |
6/28/2013 | Docket No. 13-035-T09 — Order (PDF) (Issued: 6/28/13) Rocky Mountain Power – Directed to Calculate and File Schedule 37 Avoided Costs Annually to Establish the Value or Credit for Net Excess Generation of Large Commercial Customers Under the Schedule 135 Net Metering Service |
6/12/2013 | Docket No. 13-035-T10 — Notice of Filing and Comment Period (PDF) (Issued: 6/12/13) Rocky Mountain Power – Directed to Update Annually the Valuation of Net Excess Generation Credit for Large Non-Residential Customers in Schedule 135 Net Metering Service |
July | |
---|---|
7/11/2013 | Docket No. 11-035-200 — Notice of Technical Conference (PDF) (Issued: 7/11/13) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates in Utah |
7/1/2013 | Docket No. 13-035-32 — Amended Scheduling Order and Notice of Hearing (PDF) (Issued: 7/1/13) Rocky Mountain Power – Application to Increase the Deferred EBA Rates through the Energy Balancing Account Mechanism |
7/17/2013 | Docket No. 13-035-58 — Notice of Filing of Request for Review or Rehearing and Comment Period (PDF) (Issued: 7/17/13) Rocky Mountain Power – Application for Approval of its Asset Transfer Agreement with the City of Blanding, Utah |
7/11/2013 | Docket No. 13-035-69 — Report and Order (PDF) (Issued: 7/11/13) Rocky Mountain Power – Fossil Fuel Heat Rate Improvement Plan for 2013 |
7/10/2013 | Docket No. 13-035-115 — Notice of Filing and Comment Period (PDF) (Issued: 7/10/13) PacifiCorp and Blue Mountain Power Partners, LLC – Application for Approval of Power Purchase Agreement |
7/15/2013 | Docket No. 13-035-115 — Notice of Scheduling Conference (PDF) (Issued: 7/15/13) PacifiCorp and Blue Mountain Power Partners, LLC – Application for Approval of Power Purchase Agreement |
7/23/2013 | Docket No. 13-035-115 — Notice of Continuance of Scheduling Conference (PDF) (Issued: 7/23/13) PacifiCorp and Blue Mountain Power Partners, LLC– Application for Approval of Power Purchase Agreement |
7/26/2013 | Docket No. 13-035-115 and 13-035-116 — Order Granting Motion for Continuance and Notice of Continuance of Scheduling Conference (PDF) (Issued: 7/26/13) PacifiCorp and Blue Mountain Power Partners, LLC and Latigo Wind Park, LLC – Application for Approval of Power Purchase Agreement |
7/29/2013 | Docket No. 13-035-115 and 13-035-116 — Notice of Rescheduling of Continued Scheduling Conference (PDF) (Issued: 7/29/13) PacifiCorp and Blue Mountain Power Partners, LLC and Latigo Wind Park, LLC – Application for Approval of Power Purchase Agreement |
7/10/2013 | Docket No. 13-035-116 — Notice of Filing and Comment Period (PDF) (Issued: 7/10/13) PacifiCorp and Latigo Wind Park, LLC – Application for Approval of Power Purchase Agreement |
7/15/2013 | Docket No. 13-035-116 — Notice of Scheduling Conference (PDF) (Issued: 7/15/13) PacifiCorp and Latigo Wind Park, LLC – Application for Approval of Power Purchase Agreement |
7/23/2013 | Docket No. 13-035-116 — Notice of Continuance of Scheduling Conference (PDF) (Issued: 7/23/13) PacifiCorp and Latigo Wind Park, LLC– Application for Approval of Power Purchase Agreement |
7/10/2013 | Docket No. 13-035-117 — Notice of Filing and Comment Period (PDF) (Issued: 7/10/13) PacifiCorp and Long Ridge Wind I, LLC – Application for Approval of Power Purchase Agreement |
7/15/2013 | Docket No. 13-035-117 — Notice of Scheduling Conference (PDF) (Issued: 7/15/13) PacifiCorp and Long Ridge Wind I, LLC – Application for Approval of Power Purchase Agreement |
7/25/2013 | Docket No. 13-035-117 and 13-035-118 — Scheduling Order (PDF) (Issued: 7/25/13) PacifiCorp and Long Ridge Wind I, LLC and Long Ridge Wind II, LLC– Application for Approval of Power Purchase Agreements |
7/10/2013 | Docket No. 13-035-118 — Notice of Filing and Comment Period (PDF) (Issued: 7/10/13) PacifiCorp and Long Ridge Wind II, LLC – Application for Approval of Power Purchase Agreement |
7/15/2013 | Docket No. 13-035-118 — Notice of Scheduling Conference (PDF) (Issued: 7/15/13) PacifiCorp and Long Ridge Wind II, LLC – Application for Approval of Power Purchase Agreement |
7/8/2013 | Docket No. 13-2035-01 — Order Granting Intervention (PDF) (Issued: 7/8/13) PacifiCorp – 2013 Integrated Resource Plan |
7/9/2013 | Docket No. 13-2035-01 — Order Canceling Technical Conference (PDF) (Issued: 7/9/13) PacifiCorp – 2013 Integrated Resource Plan |
7/17/2013 | Docket No. 13-035-T09 — Order (PDF) (Issued: 7/17/13) Rocky Mountain Power – Directed to Calculate and File Schedule 37 Avoided Costs Annually to Establish the Value or Credit for Net Excess Generation of Large Commercial Customers Under the Schedule 135 Net Metering Service |
August | |
---|---|
8/28/2013 | Docket No. 11-035-200 — Report and Order (PDF) (Issued: 8/28/13) Rocky Mountain Power– Application for Authority to Increase its Retail Electric Utility Service Rates in Utah |
8/16/2013 | Docket No. 12-035-100 — Order on Phase II Issues (PDF) (Issued: 8/16/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
8/20/2013 | Docket No. 13-035-02 — Order Suspending Scheduling Order and Notice of Hearing (PDF) (Issued: 8/20/13) Rocky Mountain Power – Application for Authority to Change its Depreciation Rates Effective January 1, 2014 |
8/27/2013 | Docket No. 13-035-33 — Order Establishing Final Rates (PDF) (Issued: 8/27/13) Rocky Mountain Power – Application for Authority to Revise Rates in Tariff Schedule 98, Renewable Energy Credits Balancing Account |
8/1/2013 | Docket No. 13-035-58 — Order Denying Request for Review or Rehearing (PDF) (Issued: 8/1/13) Rocky Mountain Power – Application for Approval of its Asset Transfer Agreement with the City of Blanding, Utah |
8/6/2013 | Docket Nos. 13-035-115 and 13-035-116 — Scheduling Order and Notice of Hearings (PDF) (Issued: 8/6/13) PacifiCorp and Blue Mountain Power Partners, LLC and Latigo Wind Park, LLC – Application for Approval of Power Purchase Agreement |
8/12/2013 | Docket No. 13-035-115 — Order Granting Intervention (PDF) (Issued: 8/12/13) PacifiCorp and Blue Mountain Power Partners, LLC – Application for Approval of Power Purchase Agreement |
8/12/2013 | Docket No. 13-035-115 — Order Granting Intervention (PDF) (Issued: 8/12/13) PacifiCorp and Blue Mountain Power Partners, LLC – Application for Approval of Power Purchase Agreement |
8/28/2013 | Docket No. 13-035-115 — Order Denying Motion to Disqualify (PDF) (Issued: 8/28/13) PacifiCorp and Blue Mountain Power Partners, LLC– Application for Approval of Power Purchase Agreement |
8/12/2013 | Docket No. 13-035-116 — Order Granting Intervention (PDF) (Issued: 8/12/13) PacifiCorp and Latigo Wind Park, LLC – Application for Approval of Power Purchase Agreement |
8/12/2013 | Docket No. 13-035-116 — Order Granting Intervention (PDF) (Issued: 8/12/13) PacifiCorp and Latigo Wind Park, LLC – Application for Approval of Power Purchase Agreement |
8/22/2013 | Docket No. 13-035-116 — Notice of Filing and Comment Period (PDF) (Issued: 8/22/13) PacifiCorp and Latigo Wind Park, LLC– Application for Approval of Power Purchase Agreement |
8/1/2013 | Docket No. 13-035-117 — Order Granting Intervention (PDF) (Issued: 8/1/13) PacifiCorp and Long Ridge Wind I, LLC – Application for Approval of Power Purchase Agreement |
8/27/2013 | Docket Nos. 13-035-117 and 13-035-118 — Notice of Filing of Stipulations and Restated Notice of Hearings (PDF) (Issued: 8/27/13) PacifiCorp and Long Ridge Wind I, LLC and Long Ridge Wind II, LLC– Application for Approval of Power Purchase Agreement |
8/1/2013 | Docket No. 13-035-118 — Order Granting Intervention (PDF) (Issued: 8/1/13) PacifiCorp and Long Ridge Wind II, LLC – Application for Approval of Power Purchase Agreement |
8/21/2013 | Docket No. 13-035-119 — Notice of Filing and Comment Period (PDF) (Issued: 8/21/13) Rocky Mountain Power– 2013 Smart Grid Monitoring Report |
8/22/2013 | Docket No. 13-035-130 — Notice of Filing and Comment Period (PDF) (Issued: 8/22/13) Rocky Mountain Power– Semi-Annual Demand-Side Management (DSM) Forecast Reports |
8/20/2013 | Docket No. 13-035-136 — Notice of Filing, Comment Period and Hearing (PDF) (Issued: 8/20/13) Rocky Mountain Power – Application for Approval to Cancel Schedule 194 |
8/22/2013 | Docket No. 13-035-136 — Amended Notice of Hearing (PDF) (Issued: 8/22/13) Rocky Mountain Power– Application for Approval to Cancel Schedule 194 |
8/1/2013 | Docket No. 13-2035-01— Order Granting Intervention (PDF) (Issued: 8/1/13) PacifiCorp – 2013 Integrated Resource Plan |
8/16/2013 | Docket No. 13-2035-01 — Notice of Technical Conference (PDF) (Issued: 8/16/13) PacifiCorp – 2013 Integrated Resource Plan |
8/27/2013 | Docket No. 13-2035-01 — Order Granting Intervention (PDF) (Issued: 8/27/13) PacifiCorp– 2013 Integrated Resource Plan |
8/2/2013 | Docket No. 13-035-T08 — Order Approving Proposed Tariff (PDF) (Issued: 8/2/13) Rocky Mountain Power – Proposed Changes to Electric Service Regulation No. 3 |
September | |
---|---|
9/23/2013 | Docket No. 12-035-100 — Order Denying Energy of Utah LLC’s Petition for Review, Rehearing and Clarification (PDF) (Issued: 9/23/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
9/4/2013 | Docket No. 13-035-21 — Notice of Filing and Comment Period (PDF) (Issued: 9/4/13) PacifiCorp – Semi-Annual Hedging Report |
9/23/2013 | Docket No. 13-035-32 — Order Suspending Amended Scheduling Order and Notice of Hearing (PDF) (Issued: 9/23/13) Rocky Mountain Power – Application to Increase the Deferred EBA Rate through the Energy Balancing Account Mechanism |
9/24/2013 | Docket No. 13-035-70 — Sunshine Notice (PDF) (Issued: 9/24/2013) Rocky Mountain Power – Service Quality Review Report for the Period of January 1, 2013 through June 30, 2013 |
9/11/2013 | Docket No. 13-035-71 — Order (PDF) (Issued: 9/11/13) Rocky Mountain Power’s Demand-Side Management 2012 Annual Energy Efficiency and Peak Load Reduction Report |
9/6/2013 | Docket Nos. 13-035-115 and 13-035-116 — Notice of Pre-Hearing Conference (PDF) (Issued: 9/6/13) PacifiCorp and Blue Mountain Power Partners, LLC and Latigo Wind Park, LLC – Application for Approval of Power Purchase Agreement |
9/12/2013 | Docket Nos. 13-035-115 and 13-035-116 — Amended Notice of Pre-Hearing Conference (PDF) (Issued: 9/12/13) PacifiCorp and Blue Mountain Power Partners, LLC and Latigo Wind Park, LLC – Application for Approval of Power Purchase Agreement |
9/17/2013 | Docket No. 13-035-115 — Order Granting Intervention (PDF) (Issued: 9/17/13) PacifiCorp and Blue Mountain Power Partners, LLC – Application for Approval of Power Purchase Agreement |
9/17/2013 | Docket No. 13-035-116 — Order Granting Intervention (PDF) (Issued: 9/17/13) PacifiCorp and Latigo Wind Park, LLC – Application for Approval of Power Purchase Agreement |
9/16/2013 | Docket No. 13-035-117 — Order Granting Intervention (PDF) (Issued: 9/16/13) PacifiCorp and Long Ridge Wind I, LLC – Application for Approval of Power Purchase Agreement |
9/16/2013 | Docket No. 13-035-118 — Order Granting Intervention (PDF) (Issued: 9/16/13) PacifiCorp and Long Ridge Wind II, LLC – Application for Approval of Power Purchase Agreement |
9/27/2013 | Docket No. 13-035-130 — Order (PDF) (Issued: 9/27/13) Rocky Mountain Power – Semi-Annual Demand-Side Management (DSM) Forecast Reports |
9/13/2013 | Docket No. 13-035-136 — Order (PDF) (Issued: 9/13/13) Rocky Mountain Power – Application for Approval to Cancel Schedule 194 |
9/16/2013 | Docket No. 13-035-136 — Order Granting Intervention (PDF) (Issued: 9/16/13) Rocky Mountain Power – Application for Approval to Cancel Schedule 194 |
9/6/2013 | Docket No. 13-035-146 — Notice of Hearing (PDF) (Issued: 9/6/13) Rocky Mountain Power – Formal Complaint of Ami Hines |
9/20/2013 | Docket No. 13-035-146 — Notice of Rescheduled Hearing and Response to Request for Leave to File a Reply Brief (PDF) (Issued: 9/20/13) Rocky Mountain Power – Formal Complaint of Ami Hines |
9/16/2013 | Docket No. 13-035-152 and 13-035-153 — Notice of Scheduling Conference (PDF) (Issued: 9/16/13) Rocky Mountain Power – Application for Approval of the Power Purchase Agreement between PacifiCorp and Kennecott Utah Copper LLC (Refinery) and (Smelter) |
9/23/2013 | Docket No. 13-035-152, 13-035-153 and 13-035-154 — Amended Notice of Scheduling Conference (PDF) (Issued: 9/23/13) Rocky Mountain Power – Application for Approval of the Power Purchase Agreement between PacifiCorp and Kennecott Utah Copper LLC (Refinery) and (Smelter); and Tesoro Refining and Marketing Company |
9/24/2013 | Docket No. 13-035-152, 13-035-153 and 13-035-154 — Scheduling Order and Notice of Hearings (PDF) (Issued: 9/24/13) Rocky Mountain Power – Application for Approval of the Power Purchase Agreement between PacifiCorp and Kennecott Utah Copper LLC (Refinery) and (Smelter); and Tesoro Refining and Marketing Company |
9/3/2013 | Docket No. 13-066-01 — Order (PDF) (Issued: 9/3/13) Dixie-Escalante Rural Electric Association, Inc.– Application for Authority to Issue Securities in the Form of a Revolving Line of Credit Agreement |
9/17/2013 | Docket No. 13-2508-01 — Notice of Filing and Comment Period (PDF) (Issued: 9/17/13) Ticaboo Electric Improvement District – Name Change to Ticaboo Utility Improvement District |
9/17/2013 | Docket No. 13-2508-02 — Notice of Filing and Comment Period (PDF) (Issued: 9/17/13) Ticaboo Utility Improvement District – Application for Authority to Issue Securities and Enter into Contracts |
9/10/2013 | Docket No. 13-035-T12 — Notice of Filing and Comment Period (PDF) (Issued: 9/10/13) Rocky Mountain Power– Proposed Changes to Regulation No. 4 “Supply and Use of Service” to Add Language Clarifying that Electric Vehicle (EV) Battery Charging Service is Not Considered Resale of Electricity |
9/13/2013 | Docket No. 13-035-T13 — Notice of Filing, Comment Period and Hearing (PDF)(Issued: 9/13/13) Rocky Mountain Power – Proposed Revisions to Regulation No. 12, “Line Extensions” |
October | |
---|---|
10/29/2013 | Docket No. 12-035-92 — Notice of Filing and Comment Period (PDF) (Issued: 10/29/13) Rocky Mountain Power – Voluntary Request for Approval of Resource Decision to Construct Selective Catalytic Reduction Systems on Jim Bridger Units 3 and 4 |
10/4/2013 | Docket No. 12-035-100 — Order Granting in Part and Denying in Part Rocky Mountain Power’s Petition for Review and Clarification (PDF) (Issued: 10/4/13) Rocky Mountain Power – Application for Approval of Changes to Renewable Avoided Cost Methodology for Qualifying Facilities Projects Larger than Three Megawatts |
10/29/2013 | Docket Nos. 13-035-32 and 13-035-T14 — Report and Order (PDF) (Issued: 10/29/13) Rocky Mountain Power – Application to Increase the Deferred EBA Rate through the Energy Balancing Account Mechanism; Proposed Revisions to Electric Service Schedule 94, Energy Balancing Account (EBA) Pilot Program |
10/3/2013 | Docket Nos. 13-035-115 and 13-035-116 — Order Approving Applications and Denying Intervention of Mrs. Corinne Roring (PDF) (Issued: 10/3/13)PacifiCorp and Blue Mountain Power Partners, LLC and Latigo Wind Park, LLC – Application for Approval of the Power Purchase Agreement |
10/3/2013 | Docket Nos. 13-035-117 and 13-035-118 — Order Confirming Bench Rulings Approving Qualifying Facility Contracts (PDF) (Issued: 10/3/13) PacifiCorp and Long Ridge Wind I, LLC and Long Ridge II, LLC – Application for Approval of the Power Purchase Agreement |
10/30/2013 | Docket No. 13-035-136 — Order Denying Office of Consumer Services’ Petition for Review and Clarification (PDF) (Issued: 10/30/13) Rocky Mountain Power – Application for Approval to Cancel Schedule 194 |
10/4/2013 | Docket No. 13-035-146 — Notice of Filing of Answer and Motion to Dismiss (PDF) (Issued: 10/4/13) Rocky Mountain Power – Formal Complaint of Ami Hines |
10/7/2013 | Docket No. 13-035-160 — Notice of Filing and Comment Period (PDF) (Issued: 10/7/13) Rocky Mountain Power – Application for Approval of its Agreement for Electrical Service to Additional Customers with Hurricane, Utah |
10/7/2013 | Docket No. 13-035-161 — Notice of Filing and Comment Period (PDF) (Issued: 10/7/13) Rocky Mountain Power – Application for Approval of its Agreement for Electric Service to Additional Customers with Eagle Mountain, Utah |
10/7/2013 | Docket No. 13-035-162 — Notice of Filing and Comment Period (PDF) (Issued: 10/7/13) Rocky Mountain Power – Application for Approval of its Agreement for Electric Service to Additional Customers with Monroe City, Utah |
10/7/2013 | Docket No. 13-035-163 — Notice of Filing and Comment Period (PDF) (Issued: 10/7/13) Rocky Mountain Power – Application for Approval of its Agreement for Electric Service to Additional Customers with Spring City, Utah |
10/21/2013 | Docket No. 13-035-169 — Notice of Scheduling Conference (PDF) (Issued: 10/21/13) Rocky Mountain Power – Application for Approval of Electric Service Agreement between PacifiCorp and Nucor Corporation |
10/30/2013 | Docket No. 13-035-169 — Scheduling Order and Notice of Hearing (PDF) (Issued: 10/30/13) Rocky Mountain Power – Application for Approval of the Electric Service Agreement between PacifiCorp and Nucor Corporation |
10/10/2013 | Docket Nos. 13-2508-01 and 13-2508-02 — Order (PDF) (Issued: 10/10/13) Ticaboo Electric Improvement District – Name Change to Ticaboo Utility Improvement District and Ticaboo Utility Improvement District – Application for Authority to Issue Securities and Enter into Contracts |
10/1/2013 | Docket No. 13-035-T12 — Order Approving Proposed Tariff Revisions (PDF) (Issued: 10/1/13) Rocky Mountain Power – Proposed Changes to Regulation No. 4 “Supply and Use of Service” to Add Language Clarifying that Electric Vehicle (EV) Battery Charging Service is Not Considered Resale of Electricity |
10/1/2013 | Docket No. 13-035-T13 — Order Approving Proposed Tariff Revisions and Notice of Hearing Cancellation (PDF) (Issued: 10/1/13) Rocky Mountain Power – Proposed Revisions to Regulation No. 12, “Line Extensions” |
November | |
---|---|
11/5/2013 | Docket No. 11-035-200 — Notice of Filing and Comment Period (PDF) (Issued: 11/5/13) Rocky Mountain Power – Application for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations |
11/7/2013 | Docket No. 13-035-02 — Order Confirming Bench Ruling Approving Stipulation on Depreciation Rate Changes (PDF) (Issued: 11/7/13) Rocky Mountain Power – Application for Authority to Change its Depreciation Rates Effective January 1, 2014 |
11/25/2013 | Docket Nos. 13-035-115 and 13-035-116 — Order Granting Motions to File Over-Length Petitions and Denying Petitions for Review or Rehearing (PDF) (Issued: 11/25/13) PacifiCorp and Blue Mountain Power Partners, LLC and Latigo Wind Park, LLC – Application for Approval of the Power Purchase Agreement |
11/26/2013 | Docket Nos. 13-035-115 and 13-035-116 — Order Denying Requests for Agency Review and Rehearing (PDF) (Issued: 11/26/13) PacifiCorp and Blue Mountain Power Partners, LLC and Latigo Wind Park, LLC – Application for Approval of the Power Purchase Agreement |
11/1/2013 | Docket No. 13-035-146 — Order Affirming Dismissal of Complaint (PDF) (Issued: 11/1/13) Rocky Mountain Power – Formal Complaint of Ami Hines |
11/4/2013 | Docket No. 13-035-183 — Notice of Filing and Comment Period (PDF) (Issued: 11/4/13) Rocky Mountain Power – Annual Demand Side Management Deferred Account and Forecast Reporting |
11/20/2013 | Docket No. 13-035-184 — Notice of Proposed Forecast Test Period (PDF) (Issued: 11/20/13) Rocky Mountain Power – Notice of Intent to File a General Rate Case on or about January 3, 2014 |
11/7/2013 | Docket No. 13-035-185 — Notice of Filing and Comment Period (PDF) (Issued: 11/7/13) Rocky Mountain Power – Application for Approval of its Agreement for Electric Service with Springville City, Utah |
11/12/2013 | Docket No. 13-035-186 — Notice of Filing and Comment Period (PDF) (Issued: 11/12/13) Rocky Mountain Power – Application for Approval of its Agreement for Electric Service with Hurricane City, Utah |
11/13/2013 | Docket No. 13-035-186 — Erratum Notice of Filing and Comment Period (PDF) (Issued: 11/13/13) Rocky Mountain Power – Application for Approval of its Agreement for Electric Service with Hurricane City, Utah |
December | |
---|---|
12/13/2013 | Docket No. 05-035-54 — Notice of Filing and Comment Period (PDF) (Issued: 12/13/13) Rocky Mountain Power – Application of MidAmerican Energy Holdings Company and PacifiCorp for an Order Authorizing MidAmerican Energy Holdings Company to Exercise Substantial Influence Over the Policies and Actions of PacifiCorp |
12/30/2013 | Docket No. 12-035-92 — Redacted Notice of Final Approved Projected Cost of Resource Decision (PDF) (Issued: 12/30/13) Rocky Mountain Power – Voluntary Request for Approval of Resource Decision to Construct Selective Catalytic Reduction Systems on Jim Bridger Units 3 and 4 |
12/2/2013 | Docket No. 13-035-70 — Notice of Filing and Comment Period (PDF) (Issued: 12/2/13) Rocky Mountain Power – Service Quality Review Report |
12/23/2013 | Docket Nos. 13-035-152, 13-035-153, and 13-035-154 — Order Confirming Bench Rulings Approving Qualifying Facility Contracts (PDF) (Issued: 12/23/13) Rocky Mountain Power – Application for Approval of the Power Purchase Agreement between PacifiCorp and Kennecott Utah Copper LLC (Smelter), Kennecott Utah Copper LLC (Refinery), and Tesoro Refining and Marketing Company |
12/4/2013 | Docket No. 13-035-160 — Order Approving Customer Service Agreement (PDF) (Issued: 12/4/13) Rocky Mountain Power – Application for Approval of its Agreement for Electrical Service to Additional Customers with Hurricane, Utah |
12/4/2013 | Docket No. 13-035-161 — Order Approving Customer Service Agreement (PDF) (Issued: 12/4/13) Rocky Mountain Power – Application for Approval of its Agreement for Electric Service to Additional Customers with Eagle Mountain, Utah |
12/4/2013 | Docket No. 13-035-162 — Order Approving Customer Service Agreement (PDF) (Issued: 12/4/13) Rocky Mountain Power – Application for Approval of its Agreement for Electric Service To Additional Customers with Monroe City, Utah |
12/4/2013 | Docket No. 13-035-163 — Order Approving Customer Service Agreement (PDF) (Issued: 12/4/13) Rocky Mountain Power – Application for Approval of its Agreement for Electric Service to Additional Customers with Spring City, Utah |
12/10/2013 | Docket No. 13-035-184 — Order Approving Test Period (PDF) (Issued: 12/10/13) Rocky Mountain Power – Intent to File a General Rate Case on or about January 3, 2014 |
12/2/2013 | Docket No. 13-035-189 — Notice of Filing and Comment Period (PDF) (Issued: 12/2/13) Rocky Mountain Power – Request for Major Event Exclusion for the Weather-Related Events that Occurred on September 17, 2013 |
12/5/2013 | Docket No. 13-035-196 — Notice of Scheduling Conference (PDF) (Issued: 12/5/13) Rocky Mountain Power – Application for Approval of Revisions to Back-Up, Maintenance, and Supplementary Power Service Tariff, Electric Service Schedule 31 |
12/12/2013 | Docket No. 13-035-196 — Scheduling Order and Notice of Hearing (PDF) (Issued: 12/12/13) Rocky Mountain Power – Application for Approval of Revisions to Back-Up, Maintenance, and Supplementary Power Service Tariff, Electric Service Schedule 31 |
12/12/2013 | Docket No. 13-035-197 — Notice of Scheduling Conference (PDF) (Issued: 12/12/13) Rocky Mountain Power – Application for Approval of the Power Purchase Agreement between PacifiCorp and Utah Red Hills Renewable Park, LLC |
12/19/2013 | Docket No. 13-035-197 — Scheduling Order and Notice of Hearing (PDF) (Issued: 12/19/13) Rocky Mountain Power – Application for Approval of the Power Purchase Agreement between PacifiCorp and Utah Red Hills Renewable Park, LLC |